Contact this profile for a recruitment
- Last name : ********
- First name : ********
- Phone : +91***********
- Email : ******@******.***
- Date of birth : **.**.****
- Nationality : ********
- Address : ********
- Attached CV :
Profile details
Job category searched
- Management
- Services
Professional experience
Experience in the following industries :
- Electricity, water, gas, nuclear, energy
Professional experience
- Construction Lead
- KBR Inc
- Since 10.2019
- Projects : CPF-2(Central Processing Facility), SGTF(Sour gas treatment facility), Well pads and Pipelines. Owner/Client : BOC, Majnoon, Iraq Project Location: Majnoon oil field, Basra, Iraq Key Responsibilities: Reviewing the construction and engineering documents for approval submitted by the contractor. Recommending field changes as per site conditions considering within the project specifications. weekly meetings with the contractor. Ensure the Installation of close steel piles and concrete piles as the project specification Site preparation, roads construction, earth embankment construction and fencing installation Excavation and soil improvement for the construction of pipe sleepers. Construction of concrete and steel pipe sleepers Inspection of materials received for the project and its proper storage. Monitor all the construction activities within the site confirming to project specifications.
- Project Manager
- ROBT STONE (ME) LLC, Abu Dhabi UAE
- 01.2019 - 08.2019
- Project : Rumaitha North CO2 Expansion Project(WAG), Brown Field Owner/Client : ADNOC Onshore Project Location: Rumaitha, Abu Dhabi, UAE Project Description: The project shall implement a pattern of production and injection utilizing Water Alternating CO2 injecting in existing Cluster 14(N) of Rumaitha North. The project scope includes Residual Engineering, Procurement, Construction, Pre-Commissioning and Commissioning Assistance for new installations, as well as modification/interface with existing facilities. Key Responsibilities: Laying of 8” water injection pipeline from Rumaitha CPP to Cluster 14(N) approximately 3.7 KM. Piping arrangement from Pig Receiver area to disposal well Ra-166 in Cluster 14(N). New water injection manifold and piping from manifold to new WAG wells (Ra-164 and 165) at Rumaitha cluster 14(N). CO2 injection pipes from existing manifold at cluster 14 (N) to new WAG wells (Ra-164 and Ra-165). Piping connection from existing gas lift manifold to new oil producing well Ra-162 at Rumaitha cluster 14(N). Piping connection from new oil producing well Ra-162 to existing production and test manifolds at Rumaitha cluster 14(N) with all related auxiliaries. Cathodic Protection for two new observer wells Ra-163 and Ra-167. Necessary modifications in ITR and ETR buildings at cluster 14(N) for integrating signals associated with new wells from Rumaitha North CO2 Project Expansion (WAG).
- Execution Manager
- Dhruva Infra (Mother company Manjeera Group)
- 04.2017 - 01.2019
- Project : 1) Construction of 1100 number 2 bedroom houses for Telengana Government at Nizamabad, Telangana, India. 2) Construction of 30” MS Pipeline works for M/s. Kalapatru at Kammam, Telangana, India. Owner/Client: 1) Roads and Buildings, Telangana. 2) GAIL(Gas Authority India Limited. Location : Hyderabad, India Project Description: Look after the above two project execution on day to day to basis. My role is to look after the daily construction activities in connection with the construction of 1100 number 2 bedroom houses for Telangana Government at Nizamabad at an estimated cost of 63 crores. And also the construction works of 30” MS Pipeline works at Kammam which includes resources (manpower, material and equipment) mobilisation on day to day basis.
- Construction Manager
- Dodsal & Company, Saudi
- 08.2015 - 03.2017
- Project : 56” EWG-2 Loop-2 and 56” KAEC Pipeline Project (Brown Field) Owner/Client : ARAMCO Location : Rabigh, Saudi Arabia Cost : 400 Million USD Project Description: This project comprises of laying 56”pipeline for 360 Km and 30” pipeline for 15 Km with 18 valve stations and 4 launcher & 4 Receiver stations. My role involves the responsibility for the construction of all the civil works in construction of 18 valve stations and 4 launcher & 4 Receiver stations. Spread across 360KM pipeline. Key Responsibilities: Coordination with PMC and Sub Contractors Field Engineering and updating as per the site condition Design mix concrete (C40, C30, C20) for the project from the batching plant and necessary approvals from client(Aramco) Supervision of construction of all civil activities for the construction of Mainline Valve stations, Scrapper Launchers & Receivers. Supervision and Inspection of trenching works, pre-padding, lowering, post padding, FOC cable laying, backfilling and berm construction as per the approved drawing and ITPs for the pipeline construction. Ensure the testing of Soil for bearing capacity and tests for filling for OMC and MDD by third party. Supervision of topography survey for the pipeline route Executing the activities of Testing (including third party) as per the Test plan like testing of Soil for bearing capacity and tests for filling for OMC and MDD etc.
- Pipeline Specialist
- PETRONAS, Kuala Lumpur, Malaysia
- 04.2014 - 08.2015
- Project Description: To provide technical solution to different operational units (peninsular Malaysia, Sarawak & Sabah) of PETRONAS like pipeline integrity services, Feed rehabilitation, FFS(Fitness for service), composite repairs for risers, maintenance solutions etc. Key Responsibilities: To provide technical solution to different operational units (peninsular Malaysia, Sarawak & Sabah) of PETRONAS like pipeline integrity services, Feed rehabilitation, FFS(Fitness for service), composite repairs for risers, maintenance solutions etc.. Feed studies, Feed Rehabilitation/rejuvenation Coordination with maintenance contractors Coordinate with OPU (Operational Units of PETRONAS) for Composite Repair & Maintenance Solutions and Studies. FFS(Fitness for service) Studies for pipelines Asset Life Extension Studies(PCSB) of Pipelines for SKO, PCSB Pipeline integrity management System(PIMS) RCFA(Root Cause Failure Analysis)
- Sr. Pipeline Coordinator
- GS Engineering and Construct Corp.
- 10.2011 - 03.2014
- Project : IRP – 2 (Pipeline) Project (Brown Field) Owner/Client : TAKREER PMC : TEBODIN Cost : 650 Million USD Location : Mussafa, Abu Dhabi, UAE Project Description: This project comprises of laying 900 Km pipeline of 28”, 16”, 12”, 10” and 8” OD from Al Ain, Mussafah, Ruwais to Shweihat. Key Responsibilities: Field Engineering and updating as per the site condition Coordination with PMC and Sub Contractors Supervision of construction of ROW as the project specifications and ITP Supervision and Inspection of trenching works, Welding, Coating, pre-padding, lowering, post padding, FOC cable laying, backfilling and berm construction as per the approved drawing and ITPs for the pipeline construction. Supervising the construction of Pipeline road crossing(Open Cut and HDD) works Ensure the testing of Soil for bearing capacity and tests for filling for OMC and MDD by third party. Supervision of topography survey for the pipeline route Supervision for the preparation of topography survey reports Executing the activities of Testing (including third party testing) as per the Test plan like testing of Soil for bearing capacity and tests for filling for OMC and MDD etc. Supervision the construction of valve stations(SV) Inspection of grouting works and above & below ground concrete protection works.
- Sr.Civil Engineer
- Dodsal Engineering and Construction PTE Ltd, Dubai
- 07.2007 - 10.2011
- Project : Asab Lean Gas Pipeline Project from Thammama-C to ASAB-1 Owner : GASCO Cost : 80 Million USD Project Description: This project comprises of laying of 87 Km, 36”NB size line pipes from Thammama-C(Scrapper Launcher station) To ASAB-1(Scrapper Receiver station) and having 4 intermediated Block Valve stations(BVS). Project : 48” GAN-Pipeline (EPC) from MirfaTo Habshan (Brown Field) Owner/Client : ELIXIER Cost : 80 Million USD Project Description: This project comprises of laying 43 km GAN (Nitrogen pipeline system) 48” NB size line pipes with one pig launcher station at Mirfa and Pig receiver station at Habshan. Project : Fujairah Phase-2 Water Transmission System; (Brown Field) Owner/Client : Abu Dhabi Transmission & Despatch Co. (TRANSCO). Cost : 600 million USD Project Description: This project comprises of laying 131 Km of portable water line with 64" dia cement mortar lined steel pipes. Project : Common Cooling Seawater System Phase –II, Doha, Qatar; Brown Field) Owner/Client : Qatar Petroleum (QP). Cost : 950 Million USD Project Description: Construction of Intake channel 1.5 Km with two Intake Pumping stations having Distribution and Collection Piping system 77 km with all the related auxiliary facility i.e. Operation building, 33KV switch gear building, Electro chlorination building, W/S etc
- Assistant Cartographic Officer (ACO)
- Inland Waterways Authority of India (Ministry of Shipping, Road Transport & Highways) Government of India.
- 05.2001 - 07.2007
- Key Responsibilities: Generation of maps and updating of electronic charts from pre and post monsoon satellite data (LISS and Pan merged) & SOI toposheets through GIS/IP software’s for the three national waterways and major rivers of India. Analysis of hydrographic data (field data) generated through pre and post dredged data of hydrographic survey of the national waterways and other waterways of India. The software that was mainly used in the generation and analysis of digital hydrographic data is Hypack & PDS. Involved in the project for preparation of Navigational river charts & River Atlases for the three national waterways of India through GIS and IP softwares where in my role involves preparation of the charts, supervising the work, quality check and also to get the charts validated through field verification. The real time field digital data is acquired from the field through the AHSS (Automatic Hydrographic Survey System) wherein the system is integrated with Hypack Software and GPS. Further the generated GIS data base is being maintained and monitored. Scrutiny of project proposals & estimates (like terminal proposals, terminal estimates, approach roads, Hydrographic surveys, Dredging etc). Recommendation for release of payments for the works done. Site inspections of various projects at the regional offices as per the requirement of the authority
Skills
Proactive in maintaining safe, healthy and environmentally-friendly workplace by observing company’s procedures and ISO regulations
Planning ahead to prevent problems on site before they occur including planning delivery and storage of equipment & materials
Supporting the project personnel to achieve project objectives while maintaining cross-functional teams aligned
Attentively monitoring daily, weekly and monthly activity reports and preparing weekly highlights presentation to the client
Conducting project coordination meetings and overseeing & coordinating the technical aspects of the project
Managing conformity with every dimension and tolerances as per the approved drawing and oblige with the required Project specification
Preparation of project construction documents such as method statements, ITP(Inspection Test Planes), DPR, Topography Survey Report, etc. for each activity of the project
Site management, men management and Resources optimization(men, material and equipment)
Coordination with Client and Sub Contractors
Demonstrated abilities in Civil construction works, Cross Country Pipeline construction works (Onshore & Offshore)
Provide technical solution to different operational units like pipeline integrity services, Feed rehabilitation, FFS(Fitness for service), composite repairs for risers, maintenance solutions, Asset Life Extension Studies, RCFA(Root Cause Failure Analysis), Pipeline integrity management System(PIMS) etc.
Education
Education level : Master
- Osmania University
- 08.1991 - 04.1995
- Completed my 4 years Bachelor of Civil Engineering in first class
BE Civil
- College of Commerce and Business Management, Osmania University
- 08.1995 - 02.1997
- Completed the Post Graduate Diploma in Management Information System and Computer Applications(MISCA)
Post Graduate Diploma in Management Information System and Computer Applications(MISCA)
- Birla Institute of Technology, India
- 09.1998 - 02.2000
- Completed Masters of Technology in Remote Sensing
Masters of Technology in Remote Sensing
Key Skills
- Assistance
- Delivery
- Design
- Installation
- Maintenance
- Management
- Management System
- Monitoring
- Planning
- Pumping
- Remote Sensing
- Repair
- Road
Languages
- English
- Good level
- Hindi
- Good level
More information
- Availability : in 1 month
- Geographical flexibility : Bwizibwera - Entebbe - Gulu - Hoima - Jinja - Kampala - Kasese - Kira - Lira - Masaka - Mbale - Mbarara - Mukono - Nansana - Rest of Uganda - International
- Place of residence : Hyderabad
- Accepted employment type : Permanent contract - Fixed-term contract
- Last updated : 22.07.2022
- Total views CV : 122
Other profiles that may interest you
Profile n°00088018
- Work experience: 2 to 5 years
- Industries: Banking, insurance, financeEducation, trainingMarketing, communication, media
- Education: Master
-
- Kampala University
- 03.2016 - 03.2018
Master of Arts in Human Resource Management
- Kampala university
- 03.2009 - 02.2013
Bachelor of Human Resource Management
- Languages: English (fluent)
- Skills:
ILLS
Employment Verifications Excel
Team Development Interns
Organizational Culture Finances